| Overview of detector concept | P. Checchia | 30 minutes |
Saturday, May 6: MACHINE-DETECTOR SESSION
(time to be decided, end by 16:45)
| Polarimeter studies | P. Schuler | 20 minutes | |
| Moller scattering polarimetry for high energy linear e+ e- colliders | I. Cohen/G. Alexander | 20 minutes | |
| Fast readout for the pair luminosity monitor | P. Le Du (to be confirmed) | 10 minutes | |
| Background from beam gas and thermal photon scattering | H. Burkhard | 20 minutes | |
| Muon backgrounds | H.J. Schreiber (to be confirmed) | 15 minutes | |
| e-e- collisions | S. Schreiber (to be confirmed) | 10 minutes |
Saturday, May 6: DETECTOR SESSION (continued)
(from 17:15 to 20:00)
DETECTOR COMPONENTS FOR THE TDR
| Vertex | C. Damerell | 10 minutes | |
| FWD Tracking | K. Moenig | 10 minutes | |
| Main Tracker | R. Settles | 10 minutes | |
| Calorimeter | S. Bertolucci | 20 minutes | |
| Muons | M. Piccolo | 15 minutes | |
| Coil and yoke | F. Kircher | 15 minutes | |
| DAQ | NN | 10 minutes | |
| Assembly | K. Sinram | 15 minutes |
DETECTOR SESSION (continued)
SUBDETECTOR WORK (order of talks to be adjusted at the
meeting;
session to be continued the following day since we won't be finished
by Saturday evening).
Vertex Detector:
| Status of CMOS sensors | M. Winter | ||
| Lorentz-angle measurements (cont.) | W. de Boer |
| Optimization Studies on the Intermediate Tracker | J. Hauschildt |
| TPC design issues | R. Settles | ||
| LC TPC work at LBNL | M. Ronan | ||
| TPC with GEM readout, Studies at DESY | M. Schumacher | ||
| Studies on dE/dx | M.Hauschild/
T. Behnke |
| Status of Si/W Studies | J-C. Brient | ||
| Tile Calo Properties (l, leakage, resol.) | V. Morgunov |
NN.........................................................NN