Barrel Muon Meetings
|
|
- | Ezio |
|
|
- | Umberto |
- | Massimo |
- | Montanari |
- | Silvia |
- | Troconiz |
- | Umberto |
- | Cristiana |
|
|
Agenda | |
Services | Hans |
Database news | Simone |
Drift Tube QC Meeting | Silvia |
|
|
Missing items | Umberto |
Status of sites | Bologna
(with discussion on I-beam prod. site)
Torino (with discussion on plates prod. site) Aachen Legnaro Madrid |
Operation in ISR: preparation of the activity | Hans
+ Umberto
+ Alberto + all |
Test beam 2001 (including MB2+RPC
coupling in ISR):
plans, material needed, etc. |
Enrico
+ nn |
Discussion on installation tool (procedures, etc.) and on missing common tools, with accent on who can provide what | Massimo |
Services definition | Hans |
Report from QC parallel | Silvia
Simone Paoletti: DB Current Status |
DT calibration | Roberto Cirio |
AOB | |
|
|
Cathode Production - Status Report | A. Benvenuti |
QC for AL plates production | S. Maselli |
CIEMAT Status Report | M. Cerrada |
QC Status at Madrid | M.C. Fouz |
|
|
Test beam analysis | Enrico |
Status and plans of sites | Amedeo
Alberto Marcos Hans Fabrizio |
Latest on drawings, etc. | Massimo |
Missing items for start of production | Umberto |
DT tests at CERN | Alberto et al. |
QC news | Ezio |
Material for cooling workshop | Hans |
Muon Phys & Rec. Software (PRS) organization | Ugo |
Gas workshop, services | Hans |
TSM: status | Marco DV |
Status of trigger electronics, TDC, RO boards and future perspectives | Carlos |
Location of minicrates: do we change? | Alberto |
HV: status report | Marco |
AOB | |
|
|
Status of the sites (Bo, To, Ac, M, Pd) | Alberto, Amedeo, Hans, Marcos, Fabrizio |
Status
of procurements
Miscellanea |
Umberto |
Results from measurements of first 15 HC panels | Ezio |
First ideas on installation | Massimo |
Status of test beam data analysis | Madrid: Mary-Cruz |
and discussion on the organization | E. Conti |
Testing chambers in SX5 | Alberto |
Discussion on status of QC:
- QC database: current situation - Wires Objects |
S. Paoletti |
Services: status | H. Reithler |
Handling of covers | H. Reithler |
Testbeam requests 2001 | all |
Report from the ESR | Fabrizio (not discussed) |
AOB | |
|
|
Work progress in Bologna | A. Benvenuti |
Work progress in Padova | F. Gasparini |
Tools at Aachen | H. Reithler |
Tests on the MB2 SL | M.C. Fouz |
|
|
Status of sites (TO, BO, Aachen, Madrid, LNL) | Amedeo
Alberto Hans Marcos Fabrizio |
Status of project and drawings (including a discussion on EDMS issues) | Massimo |
Preparation to test beam (detailed) | Enrico |
AOB |