SPD Meetings


Assembly coordination meeting
  May 6-7, 2002 - Padova

  1. Assembly strategy in Padova (R. Dima)   html, ps
  2. Costruzione degli half staves: assemblaggio, raccolta dati sulle colle, primi test sulle colle (R. Santoro)   html, ps
  3. ALICE SPD: layout settore (A.Pepato, M. Turcato)  


Tuesday, May 29th, 2001 - CERN
  1. Status of Alice1 tests (MIC)
  2. Status of multiplicity (F. Meddi)  html
  3. Status of bump-bonding: VTT (Campbell)
  4. Status of bump-bonding: AMS (Manzari)
  5. Test sistems (M. Burns)  html
  6. Plans for wafer probing (Riedler)
  7. Short summary of Workshop on QA for Si detectors (Riedler)
  8. SPD simulations: requirements for test beams (R. Caliandro)  postscript
  9. Irradiation tests (van Hunen)
  10. Test beam preparations (J. van Hunen)  html
  11. Pilot electronics (A. Kluge)  html
  12. Carrier bus (M. Morel)  html
  13. Pixel database (M. Caselle)  html
  14. Mechanics, cooling (See presentation of A. Pepato at the cooling workshop)
  15. Planning and spending forecasts for 2001 and 2002 (Stefanini)


February, 19th, 2001
  1. SPD Planning (G. Stefanini)
  2. Pixel Bus (M. Morel)  html
  3. Alice1 tests (R. DiNapoli)  html
  4. Test systems (M. Burns)  html
  5. Bump bonding: VTT (K. Wyllie)
  6. Bump bonding: AMS (V. Manzari)
  7. Organization of irradiation and beam tests (Van Hunen)  pdf
  8. Pilot electronics (A. Kluge)  html
  9. Mechanics, cooling (A. Pepato)
  10. Multiplicity trigger (F. Meddi)  html


November 29th, 2000
  1. Technical structure and planning (G. Stefanini)
  2. Status of the Alice1 chip tests (M. Campbell)
  3. Status of test system (P. Chochula) (html)
  4. Bump-bonding: status with VTT (M. Campbell)
  5. Bump-bonding: status of the contract with AMS (V. Manzari)
  6. Bump-bonding: first results from the b-b of Omega3 components in AMS (M. Caselle) (html)
  7. Status of the pilot electronics (A. Kluge)  html
  8. Status of the carrier prototyping (M. Morel) (html)
  9. Status of read-out & control (F. Formenti)
  10. Status of mechanics & cooling (R. Dima) (html)
  11. Status of power supply system specifications (P. Lisco) (html)
  12. Status of simulation (R. Caliandro) (ps)
  13. Status of multiplicity trigger (F. Meddi) (html)
September, 20th, 2000
  1. SPD Project Status (Giorgio Stefanini) (pdf)
  2. Testing the pixel chip (Ken Wyllie) (html, ppt)
  3. Pixel Bus (Michel Morel) (html, ppt)
  4. Status of Pilot Electronics (Alexander Kluge) (html, ps)
  5. The Lab DAQ system (Mike Burns) (html, ppt)