SPD Meetings
Assembly coordination meeting
May 6-7, 2002 - Padova
- Assembly strategy in Padova (R. Dima)
html,
ps
- Costruzione degli half staves: assemblaggio, raccolta dati sulle colle, primi test sulle colle (R. Santoro)
html,
ps
- ALICE SPD: layout settore (A.Pepato, M. Turcato)
Tuesday, May 29th, 2001 - CERN
- Status of Alice1 tests (MIC)
- Status of multiplicity (F. Meddi) html
- Status of bump-bonding: VTT (Campbell)
- Status of bump-bonding: AMS (Manzari)
- Test sistems (M. Burns) html
- Plans for wafer probing (Riedler)
- Short summary of Workshop on QA for Si detectors (Riedler)
- SPD simulations: requirements for test beams (R. Caliandro)
postscript
- Irradiation tests (van Hunen)
- Test beam preparations (J. van Hunen) html
- Pilot electronics (A. Kluge) html
- Carrier bus (M. Morel) html
- Pixel database (M. Caselle) html
- Mechanics, cooling
(See presentation of A. Pepato at the cooling workshop)
- Planning and spending forecasts for 2001 and 2002 (Stefanini)
February, 19th, 2001
- SPD Planning (G. Stefanini)
- Pixel Bus (M. Morel) html
- Alice1 tests (R. DiNapoli) html
- Test systems (M. Burns) html
- Bump bonding: VTT (K. Wyllie)
- Bump bonding: AMS (V. Manzari)
- Organization of irradiation and beam tests (Van Hunen) pdf
- Pilot electronics (A. Kluge) html
- Mechanics, cooling (A. Pepato)
- Multiplicity trigger (F. Meddi) html
November 29th, 2000
- Technical structure and planning (G. Stefanini)
- Status of the Alice1 chip tests (M. Campbell)
- Status of test system (P. Chochula)
(html)
- Bump-bonding: status with VTT (M. Campbell)
- Bump-bonding: status of the contract with AMS (V. Manzari)
- Bump-bonding: first results from the b-b of Omega3 components in AMS (M. Caselle)
(html)
- Status of the pilot electronics (A. Kluge) html
- Status of the carrier prototyping (M. Morel)
(html)
- Status of read-out & control (F. Formenti)
- Status of mechanics & cooling (R. Dima)
(html)
- Status of power supply system specifications (P. Lisco)
(html)
- Status of simulation (R. Caliandro)
(ps)
- Status of multiplicity trigger (F. Meddi)
(html)
September, 20th, 2000
- SPD Project Status (Giorgio Stefanini)
(pdf)
- Testing the pixel chip (Ken Wyllie)
(html,
ppt)
- Pixel Bus (Michel Morel)
(html,
ppt)
- Status of Pilot Electronics (Alexander Kluge)
(html,
ps)
- The Lab DAQ system (Mike Burns)
(html,
ppt)